6 research outputs found

    Small Satellite Industrial Base Study: Foundational Findings

    Get PDF
    This report documents findings from a Small Satellite (SmallSat) Industrial Base Study conducted by The Aerospace Corporation between November 2018 and September 2019. The primary objectives of this study were a) to gain a better understanding of the SmallSat communitys technical practices, engineering approaches, requirements flow-downs, and common processes and b) identify insights and recommendations for how the government can further capitalize on the strengths and capabilities of SmallSat offerings. In the context of this study, SmallSats are understood to weigh no more than 500 kg, as described in State of the Art Small Spacecraft Technology, NASA/TP-2018- 220027, December 2018. CubeSats were excluded from this study to avoid overlap and duplication of recently completed work or other studies already under way. The team also touched on differences between traditional space-grade and the emerging mid-grade and other non-space, alternate-grade EEEE (electrical, electronic, electromechanical, electro-optical) piece part categories. Finally, the participants sought to understand the potential effects of increased use of alternate-grade parts on the traditional space-grade industrial base. The study team was keenly aware that there are missions for which non-space grade parts currently are infeasible for the foreseeable future. National security, long-duration and high-reliability missions intolerant of risk are a few examples. The team sought to identify benefits of alternative parts and approaches that can be harnessed by the government to achieve greater efficiencies and capabilities without impacting mission success

    A Small Satellite Industrial Base Study: Foundational Findings

    Get PDF
    •Gain better understanding of the SmallSat community’s technical practices, engineering approaches, common processes, requirements flow-downs •Glean recommendations for how the government can further capitalize on SmallSat capabilitie

    Measurements of Integration Gain for the Cospas-Sarsat System from Geosynchronous Satellites

    Get PDF
    The GOES-R satellite is the first satellite to use a standard straight bent pipe transponder with no on-board re-modulation to support Search and Rescue (SAR) operations. Here, we report on the link measurements with a high fidelity satellite transponder simulator made up of satellite EDU (Engineering Design Units) components using an uplink from a beacon simulator and received by a GEOLUT (GEOsynchronous satellite Local User Terminal). We also report on the first ever measurements showing the performance gain obtained by the signal integration performed by the GEOLUT. In addition, a simulator made of commercially available off-the-shelf components assembled to develop the test plan was found to perform very close to the high fidelity simulator. In this paper, we describe what message integration is, how it is implemented in the particular satellite receiving station model used for this tests, and show the measured improvement in message decoding due to this integration process. These are the first tests to quantify the integration gain and are the first tests on the new SARSAT standard for the bent pipe (no onboard re-modulation) repeater used in GOES-R. An inexpensive satellite simulator to run test scripts built from off the shelf components was also found to have the same performance as a high fidelity simulator using actual satellite EDUs

    Applying EVM to Satellite on Ground and In-Orbit Testing - Better Data in Less Time

    Get PDF
    Using Error Vector Magnitude (EVM) in satellite integration and test allows rapid verification of the Bit Error Rate (BER) performance of a satellite link and is particularly well suited to measurement of low bit rate satellite links where it can result in a major reduction in test time (about 3 weeks per satellite for the Geosynchronous Operational Environmental Satellite [GOES] satellites during ground test) and can provide diagnostic information. Empirical techniques developed to predict BER performance from EVM measurements and lessons learned about applying these techniques during GOES N, O, and P integration test and post launch testing, are discussed

    Measurements of Integration Gain for the Cospas-Sarsat System from Geosynchronous Satellites

    Get PDF
    The GOES-R satellite is the first satellite to use a standard straight bent pipe transponder with no on-board re-modulation to support Search and Rescue (SAR) operations. Here, we report on the link measurements with a high fidelity satellite transponder simulator made up of satellite EDU (Engineering Design Units) components using an uplink from a beacon simulator and received by a GEOLUT (GEOsynchronous satellite Local User Terminal). We also report on the first ever measurements showing the performance gain obtained by the signal integration performed by the GEOLUT. In addition, a simulator made of commercially available off-the-shelf components assembled to develop the test plan was found to perform very close to the high fidelity simulator. In this paper, we describe what message integration is, how it is implemented in the particular satellite receiving station model used for this tests, and show the measured improvement in message decoding due to this integration process. These are the first tests to quantify the integration gain and are the first tests on the new SARSAT standard for the bent pipe (no onboard re-modulation) repeater used in GOES-R. An inexpensive satellite simulator to run test scripts built from off the shelf components was also found to have the same performance as a high fidelity simulator using actual satellite EDUs

    Increasing Small Satellite Reliability- A Public-Private Initiative

    Get PDF
    At present, CubeSat components and buses are generally not appropriate for missions where significant risk of failure, or the inability to quantify risk or confidence, is acceptable. However, in the future we anticipate that CubeSats will be used for missions requiring reliability of 1-3 years for Earth-observing missions and even longer for Planetary, Heliophysics, and Astrophysics missions. Their growing potential utility is driving an interagency effort to improve and quantify CubeSat reliability, and more generally, small satellite mission risk. The Small Satellite Reliability Initiative (SSRI)—an ongoing activity with broad collaborative participation from civil, DoD, and commercial space systems providers and stakeholders—targets this challenge. The Initiative seeks to define implementable and broadly-accepted approaches to achieve reliability and acceptable risk postures associated with several SmallSat mission risk classes—from “do no harm” missions, to those associated with missions whose failure would result in loss or delay of key national objectives. These approaches will maintain, to the extent practical, cost efficiencies associated with small satellite missions and consider constraints associated with supply chain elements, as appropriate. The SSRI addresses this challenge from two architectural levels—the mission- or system-level, and the component- or subsystem-level. The mission- or system-level scope targets assessment approaches that are efficient and effective, with mitigation strategies that facilitate resiliency to mission or system anomalies while the component- or subsystem-level scope addresses the challenge at lower architectural levels. The initiative does not limit strategies and approaches to proven and traditional methodologies, but is focused on fomenting thought on novel and innovative solutions. This paper discusses the genesis of and drivers for this initiative, how the public-private collaboration is being executed, findings and recommendations derived to date, and next steps towards broadening small satellite mission potential
    corecore